Trike Update Apr 12 - rolling chassis!

Well, we've been making slow, but steady, progress over the last couple of months.

* Joe has been working on building a set of seats - a steel frame with mesh webbing.
* I've got all 4 disc brake caliper mounts fully welded, and the steering arms welded on (awaiting some tie rod ends to fabricate the control tubes).
* The central steering units are welded to the frames but with no handlebars built yet.
* The adjustable bottom bracket units are fabricated but not yet assembled.
* Managed somehow to sever a spoke with the welder! That was a bit of an oops!

I scooted down the street today on Joe's trike, with the steering tack welded in a straight position.  These things are going to be fun!